Content Planner includes a Saved plans library for reusable planning results.
After generating a Planned Schedule, enter a Plan Name and select Save as new plan.
The saved record retains the Campaign Brief, Start Date, Planning Horizon, overview, and generated dated items.
After a successful save, the interface confirms that a new Content Plan has been saved.
Select a Plan from Saved plans to reload it into the Content Planner workspace.
The currently loaded Plan is identified as Open.
When a previously saved Plan is open, select Update selected plan to save the current Planner result back to that Plan.
The Planner can display the time the selected Plan was last saved.
Select the Delete control beside a Saved Plan when the Plan should be permanently removed.
The confirmation explains that the selected Plan will be removed from the saved Planner library.
Select Delete plan in the confirmation window to complete the removal.
Content Planner also contains a recent Prompt history list.
Planner Briefs that have been run are retained there for quick reuse.
Select a Prompt History entry to reload:
A Saved Plan is a named planning record intended for continued use. Prompt History preserves the generation request and its output so an earlier planning run can be reopened.
A Content Plan is a planning draft. Verify dates, offers, CTAs, campaign themes, and operational timing before turning individual ideas into real published content.